Artos Engineering Company CD-17 Instrukcja obsługi - Strona 4
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Urządzenia przemysłowe Artos Engineering Company CD-17. Artos Engineering Company CD-17 4 stron. Coiling bowls
Changing between coiling bowls.
1. Remove the 3 screws from the top of each of the bowls. Then lift the bowls off.
2. Remove the sheet metal belt cover.
3. Loosen the belt tensioner.
4. The bowl spindles can be mounted in 3 locations. There are 4 screws that hold each one in
place. Move the spindle to the desired location.
a. The inside location (bowls closest together) is for the 18" bowls.
b. The middle location is for the 24" bowls.
c. The outside location (bowls furthest apart) is for the 30" bowls.
5. Tension the belt.
6. For the 18" bowl install sheet metal cover 146079. For the 24 or 30" bowl install sheet metal
cover 146080.
7. Set the bowls in postion and install the 3 screws in the top of each bowl.
8. Replace the guide tube if needed For the 18" bowl use 146081. For 24 and 30" bowl use
143763. 146081 is 5 inches longer than 143763.
9. Adjust the guide tube so that the tube properly aligns with the bowl.
Belt cover
4