ALUZ A8-ZIZA-SOP Instrukcja instalacji - Strona 6

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Sprzęt oświetleniowy ALUZ A8-ZIZA-SOP. ALUZ A8-ZIZA-SOP 12 stron.

ZIZA
Standard Optic
A8-ZIZA-SOP
UNASSEMBLED APPLICATIONS
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Use 1 mounting clip every 2', rounded up. Use a minimum of 2 mounting clips
per luminaire segment. For vertical applications, create a stopper at the
bottom of the run to prevent sliding.
3
Use a mounting clip at the junction between two luminaire segments.
Example: 20' Run.
8'
3" Gap
Mounting Clip
4
Lay mounting clips along reference line and pre-drill using an appropriate
drill bit for surface material and screw size. Typical screw size is 8/32 x 1".
Note: Allow 1/4" clearance on each side of mounting clip to account for
lateral expansion. Only install mounting clips on flat, even surfaces.
5
Screw mounting clips to surface, then snap luminaire into mounting clips.
a
Screw MC mounting clips to surface, then snap fi xture into mounting clips.
Note: This mounting clip is not suitable for outward, downward, or vertical
applications.
c
Screw MC-1 mounting clips to surface, then snap fi xture into mounting clips.
c
Screw MC-2 mounting clips to surface, then snap fi xture into mounting clips.
d
Screw MC-3 mounting clips to surface, then snap fi xture into mounting clips.
20'
8'
4'
Junction between luminaire segments
ALUZ
1170 North Red Gum Street, Anaheim, CA 92806
Phone: 800 921 2254 or 714 535 7900 | Fax: 714 535 7902 | [email protected] | aluz.lighting
© ALUZ All rights reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
ASSEMBLED APPLICATIONS
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Use 1 mounting clip every 2', rounded up. Use a minimum of 2 mounting clips
per luminaire segment. For vertical applications, create a stopper at the
bottom of the run to prevent sliding.
3
Space mounting clips evenly throughout the run.
Example: 20' Run.
8'
3" Gap
Mounting Clip
e
Screw MC-4 mounting clips to surface, then snap fi xture into mounting clips.
f
Screw MC-ADJ mounting clips to surface, then snap fi xture into mounting clips.
ASSEMBLED DIMENSIONS
.90"
.84"
.88"
MC
1.97"
.93"
1.50"
MC-3
Installation Instructions
9 / 1 / 2021 / Rev 0
Mounting Clips
20'
8'
4'
Junction between luminaire segments
.94"
.93"
MC-1
MC-2
X"
1.43"
MC-4-X
Page 6 of 12
1.46"
.94"
MC-ADJ