ALUZ A8-ZIZA-STN Podręcznik - Strona 9
Przeglądaj online lub pobierz pdf Podręcznik dla Sprzęt oświetleniowy ALUZ A8-ZIZA-STN. ALUZ A8-ZIZA-STN 12 stron. Led tape
1
Measure area where luminaire will be installed. Use a laser line to create
a reference line along installation area, ensuring consistent alignment of
mounting clips. Mark location where each mounting clip will be installed
along reference line.
2
Mark location where mounting clips will be installed.
Note: The number of required mounting clips differs for dry and wet location
products. Verify number of mounting clips is appropriate for installation
environment before installing. Do not install luminaires with inadequate
number of mounting clips.
3
Lay mounting clips along reference line and pre-drill using an appropriate
drill bit for surface and screw size. Recommendation: 8/32 x 1" screw.
Note: Allow 0.25" clearance for lateral expansion of assembled mounting
clips. Only install mounting clips on flat, even surfaces.
4
Screw mounting clips to surface, then snap luminaires into mounting clips.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A8 Series | LED Tape
ZIZA Standard
(A8-ZIZA-STN)
866.ALUZ.LTG | 714.535.7900
5
If applicable, position jumper wires between luminaire segments as needed.
6
If applicable, connect disconnects between luminaires or solder connectors
using the steps from Application Guidelines.
7
Perform a continuity test before connecting luminaire to power source.
Page 9 of 12
Mounting Fixture
(Assembled Wet Location)
Installation Instructions
4 / 11 / 2022 / Rev 1