eta eHACK Instrukcja obsługi - Strona 15

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Kocioł eta eHACK. eta eHACK 20 stron. Flue gas recirculation
Również dla eta eHACK: Instrukcja obsługi (8 strony)

Concluding activities

4
Concluding activities
Mount all side panels
Mount the boiler side panels.
Fig. 4-1: Side panels
Mount panel on the top
Remount the panel on the top of the boiler again.
Fig. 4-2: Panel
Maintenance of precipitator
The precipitator must be cleaned and checked at
regular intervals. The necessary maintenance steps
are already described in the service manual of the
boiler, and they are also displayed on the screen of the
ETAtouch control system. For further information on
maintenance, refer to the boiler's service manual.
15