Clinton 6196 Instrukcja montażu - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Wyposażenie wnętrz Clinton 6196. Clinton 6196 4 stron. Bariatric treatment tables

3
Attach the leg braces to the inside of each
end of the table with the black 1
head bolts.
Attach spanner by sliding it into the grooves
4
in the leg braces and fastening using the black
1
3
/
" wood screws.
4
FOR SAFETY PURPOSES, TAKE TIME TO CHECK ALL SCREWS, BOLTS AND NUTS TO INSURE THAT
THEY ARE SECURELY TIGHTENED AND THAT THE TABLE HAS BEEN PROPERLY ASSEMBLED
1
/
" truss
2
6
H-braces on both ends of the table. Place the full-length
shelf on the spanner with the Velcro
on the braces.
7
ACCORDING TO THESE INSTRUCTIONS.
Screw in center leg levellers on the two center
5
legs. Invert and level making sure the center legs
rest on the floor.
SHELF ASSEMBLY
With the table in an upright position, apply
adhesive backed Velcro
Clean with disinfectant according to Cleaning
Guidelines on the back page of these
instructions prior to use.
strips to top edge of
®
side over the Velcro
®
Adhesive backed Velcro
strips
®
®