ClipperCreek HCS SERIES Instrukcja instalacji - Strona 5

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Ładowarka ClipperCreek HCS SERIES. ClipperCreek HCS SERIES 20 stron. Quad-mount kit. innovative infrastructure for electric and hybrid vehicles
Również dla ClipperCreek HCS SERIES: Instrukcja instalacji (9 strony)

IMPORTANT SAFETY INSTRUCTIONS

ClipperCreek Electric Vehicle Supply Equipment (EVSE) is designed with the safety concerns of the end user
as an utmost priority; however, the following safety precautions must be read and followed:
The EVSE and electrical wiring should be installed by a qualified electrician in accordance with local
electrical codes and ordinances.
Grounding Instructions - The EVSE should be connected to a grounded, metal, permanent wiring
system; or an equipment-grounding conductor should be run with circuit conductors and connected to
a grounding terminal or lead on the EVSE. Connections to the EVSE should comply with all local
electrical codes and ordinances.
Call the local service provider anytime a procedural question arises; DO NOT attempt to perform a
procedure you are unsure of.
Read all installation instructions carefully before performing the pedestal and EVSE installation.

INSTALLATION REQUIREMENTS

Required Equipment for a Quad-Mount Pedestal with two EVSE (Two EVSE per Pedestal):
One (1) ClipperCreek HCS EVSE Pedestal Kit
One (1) ClipperCreek HCS Quad-Mount Kit
Two (2) ClipperCreek HCS EVSEs
Two (2) dedicated 208V or 240V AC branch circuits
Two (2) circuit breakers, appropriately sized with respect to the charging capacity of each EVSE
Two pairs (2x2) Live Line conductors (one pair for each EVSE) that are appropriately sized based on the
EVSE power requirements with enough length to comfortably pull all the way through and above the
top of the pedestal (5 feet of length is adequate).
Two (2) Ground Line conductors (one for each EVSE) with enough length to comfortably pull all the
way through and above the top of the pedestal (5 feet of length is adequate) or a single bonded Ground
Line
2
Conduit sized to fit all Live Line and Ground line conductors
Four (4) Anchor Bolts with Nuts and Washers
Required Equipment for a Quad-Mount Pedestal with four EVSE (Four EVSE per Pedestal):
One (1) ClipperCreek HCS EVSE Pedestal Kit
One (1) ClipperCreek HCS Quad-Mount Kit
Four (4) ClipperCreek HCS EVSEs
Four (4) dedicated 208V or 240V AC branch circuits
Four (4) circuit breakers, appropriately sized with respect to the charging capacity of each EVSE
Four pairs (4x2) Live Line conductors (one pair for each EVSE) that are appropriately sized based on
the EVSE power requirements with enough length to comfortably pull all the way through and above the
top of the pedestal (5 feet of length is adequate).
Four (4) Ground Line conductors (one for each EVSE) with enough length to comfortably pull all the
way through and above the top of the pedestal or a single bonded Ground Line
Conduit sized to fit all Live Line and Ground line conductors
Four (4) Anchor Bolts with Nuts and Washers
Refer to the EVSE documentation to determine the appropriate circuit breaker current capacity.
1
All conductors must be appropriately sized for the EVSE current capacity, in accordance with local and NEC electrical codes.
2
HCS QUAD PEDESTAL KIT INSTALLATION GUIDE
2
2
Page 5
ClipperCreek
1
1
2
, Inc.