EG4 MPPT100-48HV Podręcznik użytkownika - Strona 8

Przeglądaj online lub pobierz pdf Podręcznik użytkownika dla Ładowarka EG4 MPPT100-48HV. EG4 MPPT100-48HV 10 stron. Mppt charger 100a 48vdc

EG4 MPPT100-48HV Podręcznik użytkownika
Setting for lithium battery with communication
Caution:
When the charger and inverter are communicating to the battery system simultaneously, the system may
be unstable. It is best to connect the BMS of the battery to the inverter and disconnect the MPPT charger
communication. Then let the charger work without communication in user-defined mode.
Lithium Battery Connection
If you are using an EG4 lithium battery for the MPPT charger, you can use the preconfigured lithium battery
protocol. The EG4 battery has RS485 connections to connect to the BMS port of the charger.
Please follow the steps below to implement lithium battery communication:
1. Locate your included RS485 BMS communication cable.
2. Connect the end of RS485 port of battery to BMS (RS485) communication port of charger.
3. Finish setting program 07 as LI.
4. If communication between the charger and battery is successful, the charger will work normally.
The charger RS485 port pin assignment is shown below:
Pin
number
RS485 Port
PIN1
RS485-B
PIN2
RS485-A
PIN3
GND
PIN4
GND
PIN5
NC

Fault Reference Codes

Fault Code
Fault Event
01
Bus soft start failed
02
PV voltage is too high
03
Over temperature of DCDC module
PV current offset is too high
05
06
Bus voltage is too high
07
Battery voltage is too high
Battery current offset is too high
08
09
Lithium battery communication is abnormal
Wire color
Red
White
Green
Yellow
NC
7