Blueridge BM18MFCC Instrukcja instalacji - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Centrale wentylacyjne Blueridge BM18MFCC. Blueridge BM18MFCC 16 stron. Wall ceiling air handler
Step 2: Install the main body
1. Ceiling Mount Installation
This unit surface-mounts on ceilings or low walls. For a ceiling installation, locate your ceiling type
from the diagrams below and perform the indicated actions. The unit should be hung from threaded
rod in all ceiling installations.
WOODEN ROOF
Screw or nail 2X4 across roof beams, drill holes
and bolt through M10 or M8 threaded rod.
Timber over roof beam
CONCRETE SLAB
Use concrete anchors that accommodate M10
or M8 threaded rod.
Revised 5/14/2020
Refrigerant suction
line connection
Drain point
Refrigerant liquid
line connection
Roof beam
Ceiling
Hanging screw bolts
STEEL ROOF BEAM STRUCTURE
Drill through angle steel and bolt in M10 or M8
threaded rod.
Hanging screw bolt
Threaded rod
Hook
Angle steel
Page 7