AMBIC EasiDoser Instrukcja obsługi - Strona 12

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Sprzęt rolniczy AMBIC EasiDoser. AMBIC EasiDoser 16 stron.

EasiDoser™ – Pump 1 Calibration Method
Action
Press  Button once
Press  Button once
Once correct PIN entered
When Pump stops
For DUAL Pump Operation BOTH Pumps MUST be calibrated.
EasiDoser™ – Pump 2 Calibration Method
Action
Press  Button once
Press  Button once
Once correct PIN entered
When Pump stops
Ambic Equipment Ltd – EasiDoser™ Operating Notes
Display
Display Number 23
Calibrate
Pump 1
Display Number 5
Enter PIN Code
_
Display Number 29
Press 
Calibration
Display Number 30
Volume Dispensed
1 ml
Display Number 23
Calibrate
Pump 1
Display
Display Number 24
Calibrate
Pump 2
Display Number 5
Enter PIN Code
_
Display Number 29
Press 
Calibration
Display Number 30
Volume Dispensed
1 ml
Display Number 24
Calibrate
Pump 2
To check the dispensing volume of Pump 1
take
0
distribution /delivery tube into the vessel.
The default PIN code is entered by pressing
the buttons (in sequence):-
   
Press button  once - pump 1 runs for 1
to Start
minute and then stops. Then the display
reverts to next display.
Check the volume dispensed and using 
enter the correct volume dispensed. Then
← 0 →
press button  once.
Press button  once to select Pump 2
Calibration.
0 ↓
To check the dispensing volume of Pump 2
take
0 ↓
distribution /delivery tube into the vessel.
The default PIN code is entered by pressing
the following buttons (in sequence):-
   
Press button  once - pump 2 runs for 1
to Start
minute and then stops. Then the display
reverts to next display.
Check the volume dispensed and using 
enter the correct volume dispensed. Then
← 0 →
press button  once.
Press button  once to save the configuration.
0 ↓
-12-
Comment/Action
the
calibration
vessel
Comment/Action
the
calibration
vessel
ADE7500 v1.3 (16/03/18)
and
place
and
place