Air & Allied Sales TOKU DIGGER TCD-20 Manual de instruções do operador - Página 9
Procurar online ou descarregar pdf Manual de instruções do operador para Ferramentas Air & Allied Sales TOKU DIGGER TCD-20. Air & Allied Sales TOKU DIGGER TCD-20 12 páginas.
Installation of Muffler (option parts)
Put Muffler onto the Digger as shown below drawings.
Then tighten Screws and Nuts. (6Points) Tightening Torque:29kgf・cm {3N・m}
Screw
About 2mm from
Back Head Bolt end.
9
Air & Allied Sales (Pacific) Pty Ltd
Nut
About 13mm from
Cylinder end.
www.air-allied.com.au