BobsCNC E4 Manual - Página 3
Procurar online ou descarregar pdf Manual para Sistemas de controlo BobsCNC E4. BobsCNC E4 8 páginas. Cnc router engraver bearing and rail dust kit
Também para BobsCNC E4: Manual de início rápido (3 páginas)
![BobsCNC E4 Manual](/uploads/products/server2/1090966/1090966.jpg)
It is a good idea to apply dry lube to the threaded rod once a
month . Dry lube is a good lubricant for the dusty environment
Step 1
Step 2
created when operating Your E3 and E4CNC.
Remove the washer and nut assembly from your old
mount and insert the assembly in the new Z Frame
Supports.
Mount the washer and nut assembly on the new Z Frame
securing with a zip tie. Secure the Frame Mount supports
with six M-4 screws and nuts.
Not included in the kit.
Page 3