Air Change WM-ERV Manual de instalação e manutenção - Página 10

Procurar online ou descarregar pdf Manual de instalação e manutenção para Ar condicionado Air Change WM-ERV. Air Change WM-ERV 12 páginas. Wall mount energy recovery ventilator

Air Change WM-ERV Manual de instalação e manutenção
4.3

Fans

Fan shaft and motor bearings are of permanently lubricated, sealed type and require no
regular maintenance other than a check on their general condition.
4.4

Maintenance Schedule

4.4.1 General

• Air-change systems are designed for easy maintenance, with highest quality
materials and components used throughout.
• Preventative maintenance programs will vary according to actual working
conditions and location and hours of usage by the client.
• Air-change will be pleased to provide expert advice on special service
requirements for particular installations.
IMPORTANT: Failure to carry out regular maintenance may render
warranty claims invalid if faults have been caused by lack of proper
maintenance.
carried out.

4.4.2 Monthly Maintenance Schedules.

• Filters should be inspected frequently immediately after installation to confirm
the frequency of cleaning needed for the particular location. Regular
change/clean of filters is necessary to ensure normal operating conditions.
• Vacuum or wash filters, and dry thoroughly before replacing.
The following is a guide until frequency according to usage is established.

4.4.3 Three-Monthly Checks

• Repeat the Monthly Schedule
• Clean Heat Exchanger (see section 4.1)
• Check fan blower wheels for dirt build-up and tightness on shaft
• Check all cabinet panels for correct fitting, alignment and seals, and clean
cabinet as required. Ensure no insulation has been detached from panels.
• All electrical terminals should be checked for tension on each maintenance
visit with main switch off.

4.4.4 Annual Maintenance

• Repeat monthly and three-monthly checks
WM-ERV Manual 2005.2.doc2
Air-change may request to see the maintenance schedule
10