Da-Lite 29534 Livro de instruções - Página 2

Procurar online ou descarregar pdf Livro de instruções para Ecrã de projeção Da-Lite 29534. Da-Lite 29534 14 páginas.

Da-Lite 29534 Livro de instruções
Disclaimer
Milestone and its affiliated corporations and subsidiaries (collectively "Milestone"), intend to make this manual accurate and complete.
However, Milestone makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide
for every possible contingency in connection with the installation or use of this subject to change without notice or obligation of any
kind. Milestone makes no representation of warranty, expressed or implied, regarding the information contained herein. Milestone
assumes no responsibility for accuracy, completeness or sufficiency of the information contained in this document.
Da-Lite® is a registered trademark of Milestone AV Technologies. All rights reserved.

Maintenance and Protection

Projection screens should always be installed after the
completion of construction, drywall, and painting of all adjacent
areas. If construction work needs to occur near an installed
screen, clean polyethylene sheeting should be used to cover and
protect both surfaces. Never apply adhesive tapes to the
coated surface. Always be careful to guard the screen against
damage from moving scaffolding, ladders, or staging materials.
General Cleaning
Never use solvents on or near Da-Lite rear projection screens.
Remove dust by gently blotting the screen with a soft, clean, lint-
free cloth.
Preparation
It requires at least four people to assemble a Flex Plex screen. To maintain optimal image geometry and screen alignment, a flat and
straight wall free from obstructions and angular distortions should be used. A wall opening with 5" + the ordered viewing height and
5" + the ordered viewing width must be used to maintain the precise in-wall fit of the Flex Plex screen. When assembling the screen,
choose a clean work area using padded material or other soft, clean materials. The work area should be larger than the overall screen
size and directly in front of the wall opening where the screen is to be installed (audience side).
NOTE: Please read through the installation steps and note wait times. The rolled screen surface needs to be acclimated to the room for
48 hours prior to installation (Step 1). Once the surface is unrolled it will need to lay in its unrolled state for 4 hours (Step 2).

Installation Video

To view a video of this installation, visit https://youtu.be/45xbaYpXjd8.
2
Dry Soil Marks
Clean with VM&P Naptha or with Da-Lite Lenskleen and a soft,
clean, lint-free cloth.
Cleaning of Frame and Trim
The exposed surfaces of the aluminum frames can be cleaned
with a dilute solution of detergent and water, followed by a clear
water rinse. Use a soft, grit-free cloth to preserve the anodized
finish. Protect screen surface during frame cleaning. Do not use
abrasive cleaners or solvents.