Da-Lite Da-lift 19 Instruções de instalação - Página 2

Procurar online ou descarregar pdf Instruções de instalação para Projetor Da-Lite Da-lift 19. Da-Lite Da-lift 19 4 páginas. Projector lift

When using your video equipment, basic safety precautions should always be followed, including the
following:
1. Read and understand all instructions before using.
2. Position the cord so that it will not be tripped over, pulled, or contact hot surfaces.
3. If an extension cord is necessary, a cord with a current rating at least equal to that of the appliance
should be used. Cords rated for less amperage than the appliance may overheat.
4. To reduce the risk of electric shock, do not disassemble this appliance. Contact an authorized
service dealer when repair work is required. Incorrect reassembly can cause electric shock when
the appliance is used subsequently.
5. The use of an accessory attachment not recommended by the manufacturer may cause a risk of
fire, electric shock, or injury to persons.
PRE-INSTALLATION
1. Carefully unpack Da-lift projector lift.
2. Make sure to recheck measurements of projector lift location before installation.
SUGGESTED METHODS OF INSTALLATION
1. MOUNTING DA-LIFT PROJECTOR LIFT BETWEEN JOISTS.
Install the joists at the proper height and width to fit the Da-lift you are installing (see figure 1).
NOTE: The Da-lift must be installed on top of the joists. Be sure to leave access from above for installation.
When the joists are properly installed and secured in place, slide the Da-lift in position. Bolt the two brackets (1-1/2"
x 19") to the frame. Lower the unit onto the joists and secure in place. Additional bracing may be required, based on
construction.
NOTE: Da-lift projector lift must be installed level!
2. MOUNTING DA-LIFT PROJECTOR LIFT USING 1/2" DIAMETER THREADED RODS.
Secure four 1/2" diameter threaded rods to the ceiling at the dimensions shown in figure 2, "E" and "F". Install the
mounting bracket (1-1/2" x 19") to each side of Da-lift with 1/2" diameter bolts, flat washers and nuts. Attach one
nut on each rod and run the nut up to the desired height.
Slide Da-lift projector lift up with all (4) four threaded rods into the mounting brackets. Install 1/2" nuts under the
mounting brackets. Adjust the frame to the proper height and level with bottom nuts on the rod. Lock the mounting
brackets in place with the nuts on the top of each rod. Frame must be level and solid. Additional bracing may be
required, based on construction.
SPECIFICATIONS
MODEL
LIFTING CAPACITY
Da-lift 10M
40 lbs.
Da-lift 15M
40 lbs.
Da-lift 15
300 lbs.
Da-lift 19
300 lbs.
Da-lift 19L
300 lbs.
IMPORTANT SAFETY INSTRUCTIONS

SAVE THESE INSTRUCTIONS

WIDTH A
HEIGHT B
22-5/8"
15"
22-5/8"
20"
30-3/4"
20"
32-3/4"
24"
42-3/4"
24"
DEPTH C
HEIGHT D
22"
22"
34"
38"
48"
1
DIM. E
4-1/2"
24-1/8"
9-1/2"
24-1/8"
9-1/2"
32-1/4"
13-1/2"
34-1/4"
13-1/2"
44-1/4"
DIM. F
14"
14"
16-1/4"
16-1/4"
16-1/4"