DAB ACTIVE EC 30/50 Instruções de instalação e manutenção - Página 13
Procurar online ou descarregar pdf Instruções de instalação e manutenção para Bomba de água DAB ACTIVE EC 30/50. DAB ACTIVE EC 30/50 20 páginas.
1
2
The operations, described below, for changing the electronic card must be carried out
exclusively by specialised, qualified personnel:
− Reduce the system pressure (it is recommended to close the valve of the system, located for
this purpose on delivery, near the pump ).
− Disconnect the electric connectors of the card.
− Unscrew the 4 screws of the card, keeping it pressed.
− Turn the card towards the outside.
− Pull the card upwards, keeping it tilted.
− Pay attention to the OR of the pressure probe!!!
(pressure probe: card connecting tube with a hydraulic body )
ENGLISH
Changing the electronic card
Fig. 14
It is recommended to use a straight length of pipe,
after delivery, for lifting the cover of the Active system,
in the event of inspection .
27
Male Faston outlets for
remote alarm signal