American Standard ONE T064730 Instruções de instalação - Página 2
Procurar online ou descarregar pdf Instruções de instalação para Termostato American Standard ONE T064730. American Standard ONE T064730 3 páginas. Central thermostat less volume control trim kit
1
TRIM INSTALLATION
Push CAP (1) over the O-RING SEAL (2).
Push ESCUTCHEON HOLDER (3) with lightly greased
O-RING SEAL (4) over CAP (1). Attach with the two
SCREWS (5) provided.
Align pins in back of ESCUTCHEON (5) with holes in
ESCUTCHEON HOLDER (3). Push ESCUTCHEON (5)
flush against finished wall.
2
HANDLE INSTALLATION
Align HANDLE (1) as shown and push onto KNOB MOUNT (2).
Tighten HANDLE SCREW (3) with flat blade screwdriver.
Push INDEX CAP (4) into HANDLE (2).
3
TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION
Should the hot and cold water supply pipes have been transposed making
adjustment impossible, proceed as follows:
Shut off water supply.
Remove handle and rim
Remove check stops and re-install them transposed.
Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE
CHECK STOP is now on the left.
Turn the water supply back on and perform the temperature adjustment in step 4.
4
TEMPERATURE CALIBRATION
Check that arrow marking B points vertically upwards. If not, push the BLACK
CLAMP (1) on the SECURING RING (2) to the right, pull off KNOB MOUNT (3)
and reinstall KNOB MOUNT (3) with arrow "B" pointing upwards.
SET HOT LIMIT STOP
The maximum mixed water temperature is set at 109˚F at the factory.
This setting can be changed if desired.
Remove the TEMPERATURE LIMIT STOP (4) (H shaped Black Plastic part).
Reinstall it at the desired notch as indicated in the diagram to limit the maximum
mixed water temperature to 104˚F or 112˚F.
For 100˚F adjustment, turn the water supply on. Turn KNOB MOUNT (3) until the spout
temperature is 100˚F. Check that arrow marking A on the KNOB MOUNT (3) still points
upward after adjusting the thermostat to 100˚F. If not, pull out the RED LOCKING DEVICE (5).
Remove KNOB MOUNT (3) without turning by sliding out as indicated by the arrow.
Reinstall the KNOB MOUNT (3) so that the arrow marking A points upwards.
Reinstall RED LOCKING DEVICE (5).
5
OPERATING THE VALVE
Turn on water supply on and test installed fitting.
If the system is delivering all Hot or all Cold and no mixed water the pipes are probably transposed.
See step 3 for TRANSPOSED SUPPLY PIPING.
Operate valve from off to cold to hot. Check temperature. If max mixed water
temperature is to hot or to cold see step 4 and re-calibrate the valve.
1
2
4
GREASE ESCUTCHEON
O-RING SEAL
3
5
2
3
4
CHECK STOP
(RED TO BLUE)
ARROW
"B"
4
104
109
112
2
5
OFF
PINS
1
CHECK STOP
(BLUE TO RED)
1
ARROW
"A"
3
HOT
COLD
M 9 6 8 9 8 3