AMERICANA OUTDOORS SCREEN ROOM Manual de instruções de instalação - Página 12

Procurar online ou descarregar pdf Manual de instruções de instalação para Abrigos AMERICANA OUTDOORS SCREEN ROOM. AMERICANA OUTDOORS SCREEN ROOM 14 páginas.

STEP 2
START BY SELECTING A TALLER SECTION OF SCREEN & FACE UP WITH POST AND SLIDE IN BETWEEN
TRACKING. ATTACH ANOTHER SECTION NEXT TO FIRST SCREEN. CONNECT SCREENS TOGETHER WITH
ITEMS (BB & CC) SHOWN BELOW. CLAMP SCREENS FLUSH AND PLUMB AND PRE-DRILL 5/16 HOLES
BEFORE BOLT & ACORN NUT APPLICATION. ONCE ALL SCREENS ON ONE WALL ARE CONNECTED
YOU MAY APPLY THE REMAINING ANGLE & TEK SCREWS (AA) INTO SCREEN FRAME.
FRONT BEAM
REPEAT STEP THROUGHOUT SCREEN APPLICATION. IF THERE IS A
TO BE APPLIED THE
SCREEN SECTIONS MAY BE SHORTER BY 3"+- ON THE FRONT SIDE OF SCREEN ROOM.
Americana Outdoors, Inc.
12
Screen Room Installation Guide