Donovan Quick-Flip III 1808912 Manual do Proprietário - Página 13
Procurar online ou descarregar pdf Manual do Proprietário para Equipamento industrial Donovan Quick-Flip III 1808912. Donovan Quick-Flip III 1808912 20 páginas. Electric conversion
P/N 1808922 Rev. C
WIRING DIAGRAM
direct
solenoid
circuit
breaker
+
battery
STEP 3: Cut section of dual-conductor wire to run from solenoid
to electric motor.
NOTE: Be sure to raise housing assembly to fully extended
height before cutting wire to length.
STEP 4: Crimp two 3/8" ring terminals
and two 1/4" ring terminals
1/4" ring terminals to motor and 3/8" ring terminals to
solenoid.
STEP 5: Cut section of dual-conductor wire to run from solenoid
to battery. Crimp two 3/8" ring terminals
wire and connect terminals to posts on solenoid marked
Batt+ and Batt-. Crimp one 1/4" ring terminal
one 3/8" ring terminal
1/4" ring terminal to circuit breaker post marked AUX
and connect 3/8" ring terminal to negative battery post.
STEP 6:
Divide portion of dual-conductor wire into 2 single-strand
wires (see caution). Cut section of single-strand wire to
run from positive terminal on battery to circuit breaker.
Crimp 3/8" ring terminal
ring terminal
5
to positive battery post and connect 1/4" ring terminal
to post on circuit breaker marked BAT.
toggle
switch
-
drive motor
NOTE: Refer to
wiring diagram
for steps 3, 4, 5,
6 and 9. See note
_
and caution on
previous page.
on one end of wire
6
on other end. Connect
5
on one end of
6
on other end of wire. Connect
6
onto one end of wire and 1/4"
6
onto other. Connect 3/8" ring terminal
STEP 7: Locate toggle switch where switch can easily be ac-
cessed by system operator. Weld toggle switch plate
in place.
STEP 8: Fasten toggle
switch to
plate with
screws
washers
STEP 9: Run 3-strand jacketed toggle switch wire to solenoid
and cut to length. Connect wire ends to solenoid,
placing ring terminal
2 quick disconnects to tabs marked T1 and T2.
NOTE: Kit includes 3 extra butt connectors. If excess switch
wire cannot be coiled, connectors are provided to shorten
switch wires to desired length.
STEP 10: Slide solenoid cover under bolt heads and washers
holding solenoid in place. Tighten fasteners to hold
cover and solenoid in place.
solenoid cover
and
5
TEST OPERATION
STEP 11: Operate toggle switch to verify tarp is moving in same
direction as shown on toggle. If tarp is not moving
in same direction as toggle, either swap 2 wires
connected to tabs T1 and T2 on solenoid or 2 wires
connected to motor.
Electric Installation - continued
toggle
switch
plate
A
and
A
T
.
T
toggle
switch
on post marked BATT+ and
5
solenoid
toggle
switch
plate
tighten
fasteners
10