DoorKing 1601-295 Manual de instalação - Página 8

Procurar online ou descarregar pdf Manual de instalação para Abertura de portões DoorKing 1601-295. DoorKing 1601-295 11 páginas. Break-away octagon arm installation kit
Também para DoorKing 1601-295: Manual do Proprietário (8 páginas)

1601 Octagon Breakaway Arm - Wiring Operator
MAKE SURE ALL POWER IS TURNED OFF TO OPERATOR!
OPTIONAL Convenience Open 1473
NOTE: Will NOT work with older model
2340-010 convienence open board
1473-010
1
2
1 2 3 4 5 6 7 8 9 10
NEU HOT
White
115V Neutral
SUPPLY
Terminal Block 2 Position
L20
GROUND
Ground
Panel Stud
L24
Required
Green
Remove existing wire
from Main PCB
and connect it to
Relay for
Breakaway
Sensors
Pink
Yellow
1601-269-G-7-21
UP
LOOP
ON
1 2 3 4
DOWN
LOOP
1
2
3 4 5 6 7 8
Black
L - Line
Transformer 8.5 amp
L21
N - Neutral
Transformer 8.5 amp
L22
Ground
Transformer 8.5 amp
L23
Terminal 2
V-
Transformer 8.5 amp
L18
Relay #1
1
2
Relay
NEG
POS
Black
4
3
Red
Blue
Only wire your existing
TIME
DELAY
SW 1
1601-010
POWER
SW 2
REVERSE
SENSITIVITY
Arm Relay
Contacts
C
NC
NO
Common
NC
Main PCB
12V Neg C7 L12
9
10 11 12 13
14
Terminal 9
Main PCB
Reverse Edge C5 L5
Traffic Light - Black
(to V+ Power Supply)
1601-426 Power Supply 8.5A
Red/Blue
12V Negative (-)
Solid State Relay
C6 L6
8
DoorKing Part Number
1601-295
Optional
components
Optional
LED Traffic
Light Kit
Sold Separately
White
Red/
White
Brown
Traffic
Light
Terminal
Traffic Light Cable
N-Open
Main PCB
Green Light C2 L2
Green
N-Close
Main PCB
Red Light C1 L1
Red
Common
Main PCB
LED Light C10 L11
White
Terminal 14
Main PCB
Reverse Edge C4 L4
Grey
Grey/Pink