Astrea Evolve AA25CRK Manual de substituição - Página 13
Procurar online ou descarregar pdf Manual de substituição para Equipamento industrial Astrea Evolve AA25CRK. Astrea Evolve AA25CRK 19 páginas. Wetted flow path for 200mm and 250mm chromatography columns
Figure 1.8 Photograph showing the installation of the fixed bed support
6. Ensure the support blocks are turned outwards to allow the flowcell to be located. See
Figure 1.9 below.
Figure 1.9 Photograph showing position of fixed end support blocks to enable relocation of the
7. Support the flowcell with your hand and turn the support blocks inwards to support the
flowcell. Initially, hand tighten the bolts, working diametrically opposite to ensure equal
loading on the seal. Then using the fixed end fixing tool, tighten the bolts to the torque
settings shown in the table below.
8. Fit the pipework elbow and ensure all connections are secure. Do not over tighten.
Column Diameter
mm
200
250
flowcell.
Torque Setting
Torque Setting
Nm
Ft lbf
30
30
12
22.1
22.1