Testing — Double Check Valve Assembly
Test Check Valve No. 1
Step 1: Ensure shutoff #1 is open, shutoff #2 is closed.
Step 2: Connect high side hose to test cock #3, low side to test cock
#2 and open both test cock #2 and test cock #3.
Step 3: Open valve C, then open A to bleed air from the high side.
Close valve A, then open B to bleed low side. Close valve B.
Step 4: Connect vent hose loosely to test cock #1. Open valve A to
vent air from vent hose. Tighten vent hose at test cock #1,
open test cock #1.
Step 5: Close shutoff #1. Slowly loosen hose at test cock #2 until differ-
ential gauge rises to 2psi and retighten hose. If the differential
reading does not decrease, record check valves as "tight".
Test Check Valve No. 2
Step 1: Move the high side hose to test cock #4, low side to test cock
#3 and open both test cock #3 and test cock #4. Remove vent
hose from test cock #1, open shutoff #1.
Step 2: Open valve C, then open valve A to bleed air from the high
side. Close valve A, then open valve B to bleed low side. Close
valve B.
Step 3: Connect vent hose loosely to test cock #1. Open valve A to
vent air from the vent hose. Tighten vent hose at test cock #1,
open test cock #1.
Step 4: Close shutoff #1, then slowly loosen hose at test cock #3 until
differential gauge rises to 2psi and retighten hose. If the
differential reading does not decrease, record check as tight.
Remove all hoses and restore valve to original working condition.
Note: The assembly will fail both the first and second check valve
tests above, if shutoff #2 leaks excessively. To test for a leaky #2
shutoff, use the following procedure.
Test for Leaky No. 2 Shutoff
Step 1: Connect the high side to test cock #1, low side to test cock #4.
Open test cock #1 and test cock #4. Close shutoffs #1 and #2.
Step 2: Close valve C. Open valve A, then open valve B
hose at test cock #4 to remove air. Retighten hose.
Step 3: If the differential gauge rises above 0, there is excessive
leakage at shutoff #2 and it must be replaced to test the
assembly.
Note: Product information is subject to change without notice and
supersedes all previous publications.
A Division of Watts Water Technologies, Inc.
1427 North Market Blvd. • Suite #9 • Sacramento, CA 95834 • Phone: 916-928-0123 • Fax: 916-928-9333
RP/IS-A-2000SS/SE&3000SS/SE 0314
Vent Hose
1
turn, loosen
Test Cock
2
No. 1
EDP# 7016811
Ball Type Test Valves
(A)
(C)
(B)
Needle
Valve
(Blue)
High Hose
(Yellow)
Low Hose
(White or Red)
Test Cock
Test Cock
No. 3
Test Cock
No. 2
www.amesfirewater.com
©Ames Fire & Waterworks 2007
No. 4