Akw P12 Manual de instalação - Página 7

Procurar online ou descarregar pdf Manual de instalação para Bomba de água Akw P12. Akw P12 16 páginas. Shower waste pump

Preparing Pump for mounting
1) Remove cover
2) Unscrew and open bracket with a 5 mm hexagonal key, then twist pipe connectors to unlock pump
3) Remove Pump from mounting plate
fit to a finished surface.
Pipe connections must be easily accessible and
a clearance of 100 mm around the base and
sides is recommended. Using the back plate as a
template mark the fixing holes.
Drill and plug the wall taking care there are no
hidden cables or pipes. Use all the screw fixing
positions.
Mount the backplate to the finished surface and
attach pump component. ensure it is secure by
locking the pipe connectors, closing the bracket
and tightening the bolt.
Order: 01905 823 299
|
orders.akw-ltd.co.uk

Preparing the Pump

Technical Support: 01905 560 219
7