ColdBlock CB15S Manual - Página 4

Procurar online ou descarregar pdf Manual para Equipamento de laboratório ColdBlock CB15S. ColdBlock CB15S 10 páginas.

ColdBlock CB15S Manual
TYPE
Manual
SUBJECT
CB15S – Technical Specifications, Setup and Operation Manual

2. Installing a ColdBlock

2.1 ColdBlock Parts

Your ColdBlock will come to you assembled in two parts: the heating chamber and the Cooling
Block.
Before installing the Cooling Block, installation of the infra-red lamps into the heating chamber is
required.

2.2 IR lamp installation and replacement

Lamp replacement:
WARNING: If the unit was running, turn off the controller, and unplug the controller from the
power source.
Allow the heating chamber to cool down to room temperature before attempting to perform a
lamp replacement.
The IR lamps will come to you in separate packaging to keep them safe during shipment. There are
4 lamps provided per 15 channel unit.
Lamp Installation Steps:
1. Unplug and remove unit from all power sources, this includes the power controller.
2. Remove the top plate and sleeves from the heating chamber to expose the lamp chamber.
3. Using clean gloves hold the lamp by the ceramic white coating and carefully align the lamp
prongs with the lamp holder. Once aligned insert the prongs into holder until flush and secured
in place.
CB15S – Technical Specifications, Setup and Operation Manual
CBTI-MAN-001
Rev: 0
Page 3
Date Issued: 2019-11-13