Dover PSG Mouvex CC10-24 Instalação, operação e manutenção - Página 10
Procurar online ou descarregar pdf Instalação, operação e manutenção para Bomba de água Dover PSG Mouvex CC10-24. Dover PSG Mouvex CC10-24 18 páginas.
6.7 Protection from frost
If there is a risk of frost with the product contained in the pump,
it is necessary to drain the body after each use as follows :
• Check there is no valve closed on the discharge side as
well potential counter pressure due to a check valve or
liquid remaining inside a vertical pipe.
• Rotate the pump.
• Create an air entering on the suction side during 30 seconds.
• Stop and close the pump and make sure there is no liquid
inside the pump.
• Defect or in complement, drain by the bottom plug.
Drain plug
• Flat wrenches 13 17
• Tube wrench 17
• Circlip opening pliers
• Flat screwdriver
NT 1010P00 09 20 CC1024 A e
6. USE (continued)
Step 1 :
Step 2 :
Drain plugs
7. NECESSARY TOOLS
6.8 Restarting
Follow the standard startup procedure for the pump/
motordriven pump, as well as the instructions below.
Turn the pump by hand to make sure the parts move freely.
Remove the bypass and inspect the parts and make sure they
move freely.
Makeup torques :
• M10 .............39 Nm
• M 8 ..............20 Nm
10/18