Dovre 425 CB Instruções de instalação e manual de instruções - Página 6

Procurar online ou descarregar pdf Instruções de instalação e manual de instruções para Fogão a lenha Dovre 425 CB. Dovre 425 CB 13 páginas.

Dovre 425 CB Instruções de instalação e manual de instruções
3.2.

Preparing the stove

Please inspect the stove for damage caused during transport immediately after deliv-
ery and notify your distributor in case there are any defects. Do not put the stove
into operation in the meantime.
In order to avoid damaging the stove during installation and to make handling of the
stove easier, it is recommended to remove previously all loose parts (fire-resistant
bricks, grille, ashtray, ...) from the stove. Note the location of those parts while re-
moving them, so that you have no difficulties in re -assembling the parts later on.
The stove will be supplied with the following parts:
A set of adjustable legs
Cover to seal off the connection openings
A connection collar with fastening brackets
A "cold hand" to remove the ashtray
A "cold handle" to open the door
A small shovel to remove ashes
3.2.1. Assembling and installing the legs (see sketch)
Assemble both parts of the legs at the requested length using
the M6 bolts and rings. Tilt the stove bac kwards and mount
the legs on the pre -installed M8 bolts on the bottom plate of
the stove.

3.2.2. The smoke outlet

Your stove is suitable
for two connections:
a top or a rear con-
nection.
Upon supply, the top
and
rear
exhausts
have been left open.
Depending
on
the
position chosen, one
ope ning can be cov -
ered with the blank-
ing plate supplied;
the other one can be
equipped
with
the
c onnection
collar
supplied
(see pic -
ture). Use the fixings
supplied and be sure
to tightly seal the connection collar and the blanking plate to the stove by means of
the kit or paste supplied.
500GH-510GH
6
03.27848.100