Follett HMD1400NBT Manual de instruções de instalação - Página 7
Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett HMD1400NBT. Follett HMD1400NBT 17 páginas. For ice storage bin top-mount applications
Install the louvered docking assembly.
2.1
4.1
Louvered docking assembly
3/8" ∅
high pressure
line
1000, 1400:
5/8" ∅ low pressure line
1650:
7/8" ∅ low pressure line
• Mount louvered docking assembly
• "Rough-in" the refrigerant piping
BIN • TOP-MOUNT
1-3/4" (44,5mm)
3" (76mm)
➋
1" (25,4mm)
Stub Typ
3" (76mm)
➊
➋
remote condensing
Louvered docking assembly
➊
4
7