Follett Horizon Elite Chewblet HCD1410NMS Manual de instruções de instalação - Página 6

Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite Chewblet HCD1410NMS. Follett Horizon Elite Chewblet HCD1410NMS 17 páginas. Ice machine with ride technology installation instructions for ice manager diverter valve
Também para Follett Horizon Elite Chewblet HCD1410NMS: Manual (8 páginas), Manual (8 páginas), Manual de instruções de instalação (16 páginas)

Follett Horizon Elite Chewblet HCD1410NMS Manual de instruções de instalação
Install the docking assembly.

BEFORE PROCEEDING

Prior to installing the docking assembly, ensure that the drain fitting
is oriented (right or left) correctly for your installation. An optional
straight drain fitting is also supplied. You may need to remove the
back panel of the docking assembly in order to re-orient or change
the drain fitting. Replace back panel prior to mounting the docking
assembly.
Wall bracket accessory
• Mount docking assembly to wall bracket
accessory
2.1
4.1
Docking assembly
2" (50,8 mm)
3/8˝ ∅
high pressure
line
1010, 1410:
5/8" ∅ low pressure line
• Mount docking assembly
• "Rough-in" the refrigerant piping
6
1.88" (47,8 mm)
1" (25,4 mm)
Stub Typ
3.38" (86 mm)
remote condensing
Docking assembly
Machine stand accessory
• Mount docking assembly to machine
stand accessory
3
ICE MANAGER