Follett Horizon Elite Chewblet HCF1410RMS Manual de instruções de instalação - Página 5
Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite Chewblet HCF1410RMS. Follett Horizon Elite Chewblet HCF1410RMS 17 páginas. Ice machine with ride technology installation instructions for ice manager diverter valve
Também para Follett Horizon Elite Chewblet HCF1410RMS: Manual de instruções de instalação (16 páginas)
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
➌
2 ft. x 1" OD
silicone tubing
Electrical
➊
• 120/60/1-5 amps
Potable water supply
• 10–70 psi (69–483 kpa)
• 45–90 F (7–32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drains:
➌
3/4" Barb for silicone drain, 3/8" push-to-connect for chassis drain
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4 mm/0,3 m).
Refrigeration lines
➍
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
ICE MANAGER
3/4" barb x 3/4" FPT
3/4" MPT x 1" slip
1" PVC Drain
➋
(3/8" push-in connection, 3/8" OD tubing required)
➎
remote condensing
Site preparation
3/8"
➌
chassis
➊
drain must
be used
➋
➋
1/4" per foot
(6,4 mm per 0,3 m)
➍
2
NEMA
5-15
➎
3/8" ∅ (9,5mm)
➍
5/8" ∅ (15,8mm)
➌
1'
5