Follett Horizon Elite HCF1010RBT Manual de instruções de instalação - Página 6

Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite HCF1010RBT. Follett Horizon Elite HCF1010RBT 13 páginas. For ice storage bin top-mount applications

Follett Horizon Elite HCF1010RBT Manual de instruções de instalação
Prepare the bin.
3.1
Bin top preparation
• Remove protective tape from
gaskets
6
Bin preparation
3.2
Bin top preparation
• Apply gaskets
• Install shuttle actuator
and secure with locking nut

BEFORE PROCEEDING

Prior to installing the docking assembly,
ensure that the drain fitting is oriented (right
or left) correctly for your installation. An
optional straight drain fitting is also supplied.
You may need to remove the back panel of
the docking assembly in order to re-orient or
change the drain fitting. Replace back panel
prior to mounting the docking assembly.
remote condensing
3
—
–
˜
–
through bin top
BIN • TOP-MOUNT