AMQ Solutions ACTIV-1 Manual de instalação - Página 5

Procurar online ou descarregar pdf Manual de instalação para Mobiliário de interior AMQ Solutions ACTIV-1. AMQ Solutions ACTIV-1 11 páginas. Sit-to-stand desks

4. Leg column assembly
Attach both leg columns to the stretcher bar ends using twelve M5 screws
Phase 4
Leg Column Assembly
ACTIV-1 Installation Guide
1
Attach both leg columns to the stretcher bar ends using M5 screws.
Make sure that the rod opening side
of the leg columns are facing toward
each other. This side will not have
a button pattern or bolt holes.
P5
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.