Bosch SGE63E06UC/32 Manual de instruções de instalação - Página 4

Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de lavar loiça Bosch SGE63E06UC/32. Bosch SGE63E06UC/32 37 páginas.

Bosch SGE63E06UC/32 Manual de instruções de instalação
Hammer
Hole Saw
Pipe Wrench
Adjustable
Wrench
Tape Measure
Slot Screwdriver
Phillips Screwdriver
T-20 Screwdriver
Wire Cutter
Wire Stripper
Leve I
,, ,%,
Electrical
Supply Cable - Minimum
#14 AWG, 2 conduc-
tor, 1 ground,
insulated
copper
conductors
rated 75 C or
higher.
Hot Water Supply Line - Minimum
3/8" O.D. copper
tub-
ing or metal braided
dishwasher
supply line.
Shut-off
valve and fittings
appropriate
for hot water sup-
ply line (copper
tubing/compression
fitting,
or braided
hose).
UL listed conduit
connector
or strain relief is required
if
you attach the field wiring
directly
to the terminal
block.
4