Draper Premier Series Instruções de utilização - Página 2

Procurar online ou descarregar pdf Instruções de utilização para Ecrã de projeção Draper Premier Series. Draper Premier Series 2 páginas.

Draper Premier Series Instruções de utilização
Premier/Series C by Draper
Dimensions—Premier/C
1
5
/
"
4
(133 mm)
13
1
/
"
16
(46 mm)
7
5
/
"
8
(15 cm)
1"
(25 mm)
15
/
16
(24 mm)
Ceiling Trim Kit
Targa or
Premier Case
Back
➀ Determine which side requires adjustment.
➁ Secure dowel with one hand.
Caution: Do not touch or bend surface.
➂ Using Philips-head screwdriver, depress spring-loaded adjustment
screw (see drawing) and slowly turn clockwise to tighten tension, or
counterclockwise to loosen tension. The screw adjusts in ¼ turn
increments. Adjust only one increment (¼ turn).
➃ If problem is not corrected, leave screen in position for 24 hours to allow
surface material to stretch into position.
➄ If problem still is not corrected, repeat steps 2 and 3.
3
1
/
"
8
(35 mm)
Mounting
hole
"
1
2
/
"
8
(54 mm)
Ceiling Tile
Tab-Tension Adjustment Procedure for Premier/Series C
www.draperinc.com
Dimensions—Ceiling Trim Kit
1
2
/
"
8
4"
Other Types of Installation
Suspended
Appropriate hardware
provided by installer.
Tensioning
Cable
Dowel
(765) 987-7999
Page 2 of 4
1
2
/
"
16
1
/
"
16
3
6
/
"
8
Wall
Appropriate hardware
provided by installer.
Adjustment
Screw