BD Diesel Performance X-Monitor 1087000 Manual de instalação - Página 8
Procurar online ou descarregar pdf Manual de instalação para Instrumentos de medição BD Diesel Performance X-Monitor 1087000. BD Diesel Performance X-Monitor 1087000 13 páginas. Digital pyro & boost pressure monitor
6 November 2006
Wiring Diagram
Display Installation
EXTREME CAUTION: The display is very fragile and is installed and
tested at the manufacturer. If you must remove the display in order
to paint the plastic mount, take extreme care when reinstalling. Do
not over tighten mounting screws or the display will be damaged
Install the telephone type communication wiring into the back of the display circuit
board. Apply Velcro or two-sided tape to the mounting surface and/or the tabs on
the bottom of the mount and put into place.
Run cable to the module under the dash and plug the communication cable into the
socket of the module. Once all connections are made, secure the box and any
loose wiring under the dash and away from moving or heated parts.
Ship: 88 – 446 Harrison St, Sumas, WA 98295
BD X-Monitor (Pyro & Boost Only)
and warranty will be voided.
BD Engine Brake Inc
A10 – 33733 King Rd, Abbotsford, BC, Canada V2S 7M9
Ph: 604.853.6096 Fax: 604.853.8749 Internet: www.bd-power.com
Mail: PO Box 231, Sumas, WA 98295
8