AirStage AOUA36RLAVM Manual de instalação rápida - Página 13

Procurar online ou descarregar pdf Manual de instalação rápida para Bomba de calor AirStage AOUA36RLAVM. AirStage AOUA36RLAVM 16 páginas. J-ii series

Please refer to the applicable indoor unit and Remote Control
Installation Manuals for complete details.
This is a summary of Remote controller wiring:
3 wire remote- Connect Y1, Y2 and Y3 as shown.
2 wire remotes ("T" series IU's only)- Connect only Y1 and Y2 terminals
of the indoor unit to the 2 wire Remote control.
YOU ARE NOW READY TO APPLY POWER TO ALL INDOOR AND
OUTDOOR UNITS.
PLEASE VERIFY REQUIRED VOLTAGE AT THE IU AND OU DISCONNECT
BEFORE APPLYING POWER.
ALL AIRSTAGE IU'S REQUIRE 208/230 SINGLE PHASE POWER.
AFTER PRESSING "ENTER" FOR MORE THAN (3)
SECONDS, PROCEED TO QIG STEP 21b.
20
AFTER POWERING THE EQUIPMENT AND BEFORE THE SYSTEM IS OPERATED,
AN "INDOOR UNIT CONNECTION CHECK" MUST BE PERFORMED!
THIS CHECK IS PERFORMED AT THE OUTDOOR UNIT.
6b
21a
Continued from Step 21a.
Refer to the Installation Manual for complete installation details.
8
21
21b