Drazice NADO 1000/25v11 Manual de operação e instalação - Página 10

Procurar online ou descarregar pdf Manual de operação e instalação para Aquecedor de água Drazice NADO 1000/25v11. Drazice NADO 1000/25v11 10 páginas. Storage tanks

Drazice NADO 1000/25v11 Manual de operação e instalação
Thermal insulation NEODUL LB PP
Insulation NEODUL of 80 mm thickness. It consists
of an upper cover, flange cover and hole caps.
Insulation is supplied in a separate packaging.
We recommend that the insulation was fitted
at room temperature.
At temperatures significantly below 20 °C
the insulation shrinks. This disables its easy fitting.
Figure 5
7 DISPOSAL OF PACKAGING MATERIAL AND NON-
FUNCTIONING PRODUCT
A service fee for providing return and recovery of packaging material has been
paid for the packaging in which the product was delivered. The service fee was
paid pursuant to Act No 477/2001 Coll., as amended, at EKO-KOM a.s. The client
number of the company is F06020274. Take the water tank packages to a waste
disposal place determined by the municipality. When the operation terminates,
disassemble and transport the discarded and unserviceable heater to a waste
recycling centre (collecting yard), or contact the manufacturer.
2-9-2019
- 10 -