We recommend that the hot water distribution from the heater was as short as possible
to minimize heat losses.
Heaters TO UP must be provided with a discharge valve mounted on the cold service water
inlet to the heater for potential disassembly or repair.
When assembling the security equipment, follow the standard.

8 ELECTRIC INSTALLATION

The electrical wiring scheme is attached in the manual to the water heater (Figure 4). The heater must be
connected via a separate supply with a circuit breaker. The heater is connected to the 230V/50Hz mains with
a power cable by inserting the plug into the socket. The electrical installation must comply with valid electrical
and technical standards. The connection of the heater to the electrical network is made after the water
supply installation of the heater and the filling of the heater with water.
Follow the rules of protection against electrical injuries in accordance with standard CSN 33 2000 - 4 - 41.
The degree of protection of the electrical parts of the heater is IP X5.

9 HEATER COMMISSIONING

After connecting the heater to the water supply network, the heater can be put into operation.
Procedure:
a)
check the electric and water main installation
b)
open the hot water valve on the combination faucet
c)
open the cold water inlet valve to the heater
d)
as soon as the water starts running through the hot water valve, the heater is filled and the valve
closes
e)
using the front-end main switch open electricity and thus the heater activates
Before first use, or after longer periods, it is necessary to ensure flushing, irrigation
and ventilation heater before starting the heating. The first heating tank must be monitored.
- 8 -