Drazice OKCE 160 NTR Manual de operação e instalação - Página 17
Procurar online ou descarregar pdf Manual de operação e instalação para Caldeira Drazice OKCE 160 NTR. Drazice OKCE 160 NTR 18 páginas. Tank-type water heater for vertical
mounting
Também para Drazice OKCE 160 NTR: Manual de operação e instalação (13 páginas), Manual de operação e instalação (19 páginas)
4 IMPORTANT NOTICES
4.1 INSTALLATION REGULATIONS
-
Without a confirmation of performed electrical installation issued by an authorised company,
the warranty certificate shall be void.
-
Check and exchange the Mg anode regularly.
-
You have to apply for approval of a local power supplier to connect the heater.
-
No stop valves can be put between the heater and the safety valve.
-
If the overpressure in the water main exceeds 0.48 MPa, a pressure control valve must be mounted
before the safety valve.
-
All hot water outputs must have a combination faucet.
-
Before filling the heater with water for the first time, it is recommended to fasten the flange
connection nuts of the tank.
-
It is not allowed to handle the thermostat, aside from temperature resetting with a control button.
-
All electric installation handling, adjustment and replacement of the regulation elements shall only
be performed by an authorised service company.
-
The thermal fuse must not be turned off! In case of thermostat defect, the thermal fuse interrupts
electric power input to the heating element if the water temperature in the heater exceeds 90 °C.
Both the electric and water installation must follow and meet the requirements and
regulations relevant in the country of use!
4.2 DISPOSAL OF PACKAGING MATERIAL AND MALFUNCTIONING
PRODUCT
A service fee for providing return and recovery of packaging material has
been paid for the packaging in which the water heater was delivered.
The service fee was paid pursuant to Act No 477/2001 Coll., as amended,
at EKO-KOM a.s. The client number of the company is F06020274. Take
the water boiler packages to a waste disposal place determined by the town.
When the operation terminates, disassemble and transport the discarded and
unserviceable heater to a waste recycling centre (collecting yard), or contact
the manufacturer.
- 17 -