Drazice OKCV 200 NTR Manual de operação e instalação - Página 13

Procurar online ou descarregar pdf Manual de operação e instalação para Caldeira Drazice OKCV 200 NTR. Drazice OKCV 200 NTR 17 páginas. Tank type indirect water heaters

Drazice OKCV 200 NTR Manual de operação e instalação
Fig. 1
Connection of the heater exchanger (left, right) and fittings at the cold water inlet
Connection to the cold water inlet
must conform to ČSN 060830.
0 - Air outlet valve
U – Shut-off valve
P1 - Safety valve with backflow flap
P2 - Safety valve for heating circuit
M - Manometer
Z – Test valve
V - Drain valve
Fig. 2
Fitting of hinges and thermometer
onto the heater
13