Anchor F3 Manual de instruções de instalação - Página 14
Procurar online ou descarregar pdf Manual de instruções de instalação para Tenda Anchor F3. Anchor F3 16 páginas. Frame tent
STEP 2
Begin connection of components Cont'd
Once the Gable End Arch is completely assembled, Start on the Second Arch. Connect rafters to Ridge weldment,
then connect Eave/Ridge purlins.
Continue in like manner until all arches are assembled.
STEP 3
Connect Arches
Beginning at one of the gable ends, raise the Gable end Arch and then the Second Arch. Connect Eave and ridge purlins
so the Arches are standing and stable. Continue swinging arches upright and connecting purlins until the upper frame is
complete. Optional Ridge Brace for 30' frame not shown.
Eave/Ridge
Purlin
Lifting Bar with Cradle
could be used for help
with lifting Ridge Purlins.
(Included with optional
installation kit.)
14
Gable End Arch
Second Arch
Gable End Arch
Installation Cross Web
Installed (30' Frame only).
See Page 7 for installation.
Third Arch
Figure 3