Ancona Palermo AN-4107 Manual - Página 2
Procurar online ou descarregar pdf Manual para Produto de canalização Ancona Palermo AN-4107. Ancona Palermo AN-4107 6 páginas.
Installation size map
2 1/16" (52 mm)
Three Hole Installation
Test Faucet Installation
A. Move handle into "OFF" position.
B. Turn on water supplies. Check connections for leaks.
C. Remove hand shower and let both hot and cold water
run for one minute. This will help clean any debris that
might otherwise clog the system. Replace hand shower.
D. Operate handle up and down, in cold and hot positions,
to flush water lines thoroughly.
Simply rinse the surface with clear water or
mild liquid detergents if necessary Dry the
Maintenance:
faucet with a clean soft cotton cloth Do not
use any cleaning agents containing
acids polish abrasives or harsh cleaners
Step 1: Repeat steps 1 and 2 from Single
Hole Installation.
Step 2: Insert plate before inserting faucet
body into sink deck.
Step 3: Repeat steps 3 to 6 from
Single Hole Installation.
Step 4: Ensure all connections are
tightly set in place to avoid
leakage.