Carmanah R829-E Manual de início rápido - Página 7
Procurar online ou descarregar pdf Manual de início rápido para Equipamento de iluminação Carmanah R829-E. Carmanah R829-E 20 páginas. Traffic beacon
Também para Carmanah R829-E: Manual de substituição do sistema de gestão de energia (12 páginas), Manual de instalação (20 páginas)
E/F SERIES QUICK START GUIDE
Solar Engine Mounting – Side of Post
4.3
1. Obtain lock nut included with solar engine. Fully tighten against bottom of solar engine.
2. Thread hex nut onto bottom of solar engine.
3. Insert other hex nut into channel in side of post mount so it lines up with hole in top of mount.
4. Thread solar engine all the way onto nut in channel. Loosen less than one turn until solar engine faces
South (for Northern Hemisphere locations).
5. Tighten top hex nut down against mount.
7
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
|
carmanah.com