ATIM MR1 Manual do utilizador - Página 7
Procurar online ou descarregar pdf Manual do utilizador para Instrumentos de medição ATIM MR1. ATIM MR1 17 páginas. Metering / state of dry contacts
Installation of the OPTO cable
a. Description of pieces
b. Procedure
Fix the washer (F) on the location where the survey is to be carried out, so that the light
signal passes through the middle in the hole. It is important to clean the area and dry it to
ensure a reliable grip in the long term.
Position the part (E) on the washer so that the light signal is visible through the hole that
goes right through it. Alignment is essential.
Mount the cable (C) in the MR1 housing (A), lock the assembly by tightening the nut (B).
Finally, pass the clamping sleeve over the cable (C), place the other end of the cable at the bottom of the sleeve (E)
and clip parts (D) & (E) together to exert strong pressure against the adhesive washer (F).
A
B
C
D
E
F
ATIM_ACW-MR1_UG_EN_V1.6
MR1 casing
Nut Tightening Stuffing box
Cable
Clamping sleeve
Fixing sleeve
Adhesive washer
6