3M 3MRO401 Manual de instruções de instalação e funcionamento - Página 4
Procurar online ou descarregar pdf Manual de instruções de instalação e funcionamento para Sistemas de filtragem de água 3M 3MRO401. 3M 3MRO401 12 páginas. Reverse osmosis drinking water filtration system
Também para 3M 3MRO401: Instruções de instalação e operação para (12 páginas)
• Installation may require drilling a hole in your sink top. A variable speed drill and specialized drill bits
may be needed. We highly recommend professional installation.
This manual explains the installation, operation and maintenance of the 3MRO401 Reverse Osmosis Water Filtration
System. Please read each section of this manual carefully.
The RO drinking water system is designed to connect permanently to a home's plumbing system. The installation MUST
conform to your state and local plumbing codes. Advanced plumbing skills are required to complete your installation.
Failure to install the system as instructed will VOID the warranty.
A. Determine the system location ........................................................................................................5
B. Prepare the area for installation ......................................................................................................5
C. Determine faucet mounting location ...............................................................................................5
D. Make the faucet mounting hole .......................................................................................................5
Mount the faucet .............................................................................................................................6
Prepare the system for installation .................................................................................................6
G. Install the feed water connection and tubing ..................................................................................7
H. Prefill and sanitize the storage tank ................................................................................................7
I.
Install the drain connection .............................................................................................................7
Install the filtration assembly and storage tank ...............................................................................8
K. Make the tube connections .............................................................................................................8
Start up the system .........................................................................................................................8
M. Flush the system and check the operation ......................................................................................8
N. Installation troubleshooting.............................................................................................................9
A. Important water quality assurance requirements ............................................................................10
B. Replacing the filters ........................................................................................................................10
C. Replacing the RO membrane module .............................................................................................10
D. Sanitizing the RO system ................................................................................................................11
Long term non-use .........................................................................................................................12
INTRODUCTION
TABLE OF CONTENTS
..........................................................................................................12
4