Atlantic alfea S5 Manual de operação - Página 16

Procurar online ou descarregar pdf Manual de operação para Bomba de calor Atlantic alfea S5. Atlantic alfea S5 16 páginas. Alféa s series heat pump air/water split, single service

3.11 Configuring room control unit (Option)

Installation equipped with a room control unit
During commissioning, after an initialisation period of
approx. 3 minutes, the user's language must be set :

4 Maintenance

In order to insure your appliance operates correctly for
many years, the maintenance operations described below
are required at the start of each heating season.
Generally, these are performed as part of a service
contract.
4.1

Checking that the floor system is full

The pressure in the floor system when it is cold and when
it has stopped must be 1,5 bars.
If filling and re-pressurization are required, check what
type of fluid has been used initially.
If in any doubt, contact your installer.
Warning : If frequent filling is required, have the installation's
sealing checked.
This appliance is marked with this symbol. This means that electrical and electronic products shall not be mixed with general household waste.
European Community countries(*), Norway, Iceland and Liechtenstein should have a dedicated collection system for these products.
Do not try to dismantle the system yourself as this could have harmful effects on your health and on the environment.
The dismantling and treatment of refrigerant, oil and other parts must be done by a qualified installer in accordance with relevant local and national regulations.
This appliance must be treated at a specialized treatment facility for re-use, recycling and other forms of recovery and shall not be disposed of in the municipal
waste stream.
Please contact the installer or local authority for more information.
* subject to the national law of each member state
Date of installation :
Contact of your heating technician or your after-sales service.
- Press the key OK.
- Choose menu (User interface).
- Choose language : English.
4.2

Checking the outdoor unit

Dust off the heat exchanger if necessary, being careful not
to damage the fins.
Check that there is nothing obstructing the passage of air.
4.3

Checking the refrigeration circuit

When the refrigerant fluid charge is in excess of 2kg
(S 10, S 13 and S 16 models), it is compulsory to have an
approved after sales service check the refrigeration circuit
every year.
Consult your heating technician.
www.atlantic.fr
Société Industrielle de Chauffage
SATC - BP 64 - 59660 MERVILLE - FRANCE