Atlas LR10 Manual - Página 8

Procurar online ou descarregar pdf Manual para Sistemas de elevação Atlas LR10. Atlas LR10 18 páginas.

Atlas LR10 Manual
Wire connection for three phase hydraulic power unit motor
1. Electric schematic diagram
2.
Steps for connection
1
Three Power supply wires marked (L1 L2 L3) connected with A.C.contactor terminal
marked L1 L2 L3 respectively.
2
A.C. contactor terminal marked L1connected with button switch terminal marked 4#, L2
connected with A2, terminal marked A1 connected with button switch terminal
Push button
(See Fig.10)
Fig.10
(See Fig.11)
Connection diagram
Fig. 11
8
Push button
marked 3#.
L3
L1
L2
A1
4#
3#