AirTek TW25 Manual de instalação, operação e manutenção - Página 20
Procurar online ou descarregar pdf Manual de instalação, operação e manutenção para Desumidificador AirTek TW25. AirTek TW25 20 páginas. Heatless desiccant compressed air dryer
17 C. ANALYZING CHART
DATE: _______________
MODEL: _______________
SERIAL NUMBER: _______________
AMBIENT TEMPERATURE: _______________
OPERATING PRESSURE: _______________
PRESSURE (PSIG)
LEFT
TIME
TOWER
1 MIN
2 MIN
3 MIN
4 MIN
5 MIN
6 MIN
7 MIN
8 MIN
9 MIN
10 MIN
11 MIN
12 MIN
13 MIN
14 MIN
15 MIN
16 MIN
17 MIN
18 MIN
19 MIN
20 MIN
PERFORM EACH OF THE FOLLOWING CHECKS ONCE DURING LEFT TOWER DRYING & ONCE DURING RIGHT TOWER DRYING:
IS THERE ANY "BACK PRESSURE" IN THE REGENERATING TOWER? Y / N _______________ PSIG
WITH THE PURGE VALVE FULLY CLOSED, IS THERE ANY FLOW FROM THE EXHAUST VALVE? L: Y / N
HAVE YOU CHECKED THE CONDITION OF YOUR COALESCING PREFILTER ELEMENT?
HAVE YOU CHECKED THE AUTO DRAINS ON YOUR SEPARATOR, RECEIVER & PREFILTER TO ENSURE PROPER DRAINAGE?
AIRTEK
4087 WALDEN AVENUE, LANCASTER, NY 14086
ANALYZING / PERFORMANCE CHART
TW10 -- TW55 HEATLESS TWIN TOWER DRYER
PURGE
RIGHT
GAUGE
TOWER
LEFT
DRYER INLET FLOW (SCFM): ____________________
DRYER INLET TEMPERATURE: ____________________
PURGE SETTING: ____________________
COMPRESSOR HP: ____________________
CYCLE SWITCH SETTING:
STATUS LIGHTS ("X" WHEN LIT)
DRYING
REGENERATING
RIGHT
LEFT
Tel: (716) 685-4040
STND 10 MIN
SHORT 5 MIN
DEW
REPRES
POINT
RIGHT
(Optional)
R: Y / N
Fax: (716) 685-1010
Pg. -20-