Ankom TDF Series Procedimento de serviço - Página 9

Procurar online ou descarregar pdf Procedimento de serviço para Instrumentos de medição Ankom TDF Series. Ankom TDF Series 9 páginas. Vacuum sensor installation
Também para Ankom TDF Series: Procedimento de serviço (7 páginas), Procedimento de serviço (4 páginas)

Paddle Bar Replacement
TS021
Service Procedure
TDF
Revised: 01/24/2017
18.
Reinstall the back panel.
Replace the clear back panel of the TDF instrument securing it with the six acorn nuts removed in the first step.
With this completed you are now ready to return your TDF instrument to service. Contact ANKOM Technology for
instructions on returning the faulty Paddle Bar Assembly.
ANKOM Technology  2052 O'Neil Road  Email: [email protected] Phone: 315-986-8090  Fax: 315-986-8091
pg. 9 of 9