DT DT SCREENS Dynamic 2S Manual de instalação - Página 7

Procurar online ou descarregar pdf Manual de instalação para Acessórios para projectores DT DT SCREENS Dynamic 2S. DT DT SCREENS Dynamic 2S 12 páginas.

DT DT SCREENS Dynamic 2S Manual de instalação

Electrical Connections

On the bottom section of the frame is the control box. At either end of this are the
connections to make to the mask motors and sensors. The mask motor connections are
simple push together connectors.
The sensor connectors locate and then push onto the control box and then screw up to
make the connection and lock in place. Do this for both Mask sensors (one either end).
Connect the IEC power cable to the mains supply.
Connect the RS232 control cable onto the control port on the left end of the control box.
Dress the cables along the bottom of the frame using the cable ties provided. It is important
to ensure that you do not have loops in the cable which could impede the running of the
masks.
Mask Connections
The masks are tensioned by 'Silent Tension System' bands which run between each of the
masks.
Take the first band pass it behind the gap behind the control box at the bottom of the
screen.
Pull the Right end and hook it on the steel loop at the bottom of the right mask bar.
Pull the left end of the band out towards the left mask and hook onto the steel loop at the
bottom of the left mask bar.
Repeat the process to stretch the next band between the loops on the top of the left and
right mask bars.
Take care when pulling out the Silent Tension System bands. If you let go of them they will
spring back and could cause injury is allowed to do so under tension.
Dynamic 2S Installation Manual – V0.2
7