dtec GJD 350 Manual de instalação e configuração - Página 2

Procurar online ou descarregar pdf Manual de instalação e configuração para Sensores de segurança dtec GJD 350. dtec GJD 350 12 páginas.

Installation & Set Up Guide
D-TECT QUICK INSTALLATION GUIDE
Apply supply voltage to the unit, the blue led flashes 3 times
The detector takes approximately 2-3 minutes to settle
The walk test led is factory set to OFF. Pressing the programme button once
will enable the walk test led for 5 minutes.
THE FRONT COVER MUST BE FITTED WHEN WALK TESTING
FACTORY SETTINGS ARE:-
1 RANGE 40 METRES
2 PULSE COUNT 1
3 LED OFF
4 CCTV1 N/C CCTV2 N/O
5 CONTACT TIMER 5 SECONDS
The A and S connections are for use with GJD lighting controllers
2