3onedata TNS5800-20GT-2P110 Manual de instalação rápida

Procurar online ou descarregar pdf Manual de instalação rápida para Interruptor 3onedata TNS5800-20GT-2P110. 3onedata TNS5800-20GT-2P110 4 páginas. Managed rack-mounted industrial ethernet switch

TNS5800 Series
Managed Rack-mounted Industrial
Ethernet Switch Quick Installation
Guide
3onedata Co., Ltd.
Address:
3/B, Zone 1, Baiwangxin High Technology
Industrial
Park,
Xili,
Shenzhen
Website:
www.3onedata.com
Tel:
+86 0755-26702688
Fax:
+86 0755-26703485
【Package Checklist】
Please check whether the package and accessories are intact
while using the switch for the first time.
1.
Industrial Ethernet switch
3.
Quick installation guide
5.
Warranty card
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
The series of product is layer 3 managed rack-mounted
industrial Ethernet switch designed for rail transit industry.
The models are:
Model I.
Model II. TNS5800-20GT-2P110 (20 Gigabit copper ports +2
Model III. TNS5800-20GT-2P24 (20 Gigabit copper ports +2
Model IV. TNS5800-12GT-2P110 (12 Gigabit copper ports +2
【Panel Design】
Front view
1.
2.
3.
4.
5.
6.
Nanshan
District,
7.
8.
9.
10.
11.
12.
2.
CD
4.
Certification
1.
2.
3.
4.
TNS5800-4GT-8T-P110 (4 Gigabit copper ports + 8
100M copper ports + 1 110VAC/DC
(100~240VAC/DC) power supply)
110VAC/DC power supplies)
24VDC power supplies)
110VAC/DC power supplies)
Model I
Hanger
Grounding screw
Relay alarm output terminal block
Power input terminal block
Power supply indicator (PWR)
Running indicator (RUN)
Alarm indicator (ALARM)
Console port
100M copper port (M12)
100M copper port connection indicator
Gigabit copper port (M12, G1 and G2 are a group
of bypass, G3 and G4 are a group of bypass)
Gigabit copper port connection indicator
Model II Model III
Hanger
Power supply port
Grounding screw
Gigabit copper port (M12, G17 and G18 are a
group of bypass, G19 and G20 are a group of
bypass)
5.
Restore factory setting button
6.
Console port
7.
Link/Act indicator
8.
Power supply indicator (P1,P2)
9.
Alarm indicator (ALM)
10.
Running indicator(RUN)
1.
Hanger
2.
Grounding screw
3.
Power supply input terminal block
4.
Power supply indicator (P1/P2)
5.
Running indicator (RUN)
6.
Alarm indicator (ALM)
7.
Console port
8.
Gigabit copper port (M12, G1 and G2 are a group
of bypass, G3 and G4 are a group of bypass)
9.
Gigabit copper port connection indicator
Rear view
Left view
Right view
【Mounting Dimension】
Unit: mm